
Upload the condition survey. The estimator measures every station, every culvert and every structure, prices it against your own rate schedule, and returns a complete bill of quantities. Then it prices the whole road again in a second, independent engine — and if the two disagree by a pesewa, it says so rather than handing you a number.
A complete CESMM4-coded bill for a low volume road in minutes — checked by two independent engines that must agree before it is issued.
One subscription, monthly or annual, unlocks every BESPA application. 7 days free, cancel any time. The demo on this page is free to try.
A Python engine prices the road in seconds; the original Excel master estimator then recalculates the same road independently. The bill is issuable only when both agree. Neither engine is trusted on its own.
Every station from start to finish at 50-metre intervals — roadworks, drainage, structures and ancillaries — each quantity carrying the working that produced it.
19 box-culvert types from 2×2 to 4×4 metres, one to four cells, with reinforcement scheduled across 14 bar marks; pipe culverts 600 to 1800 mm; U-culverts 700×900 to 1800×1800. Steel is priced by diameter under its own code, not averaged.
Priced from your own master rate workbook. New rates or a new item means replacing one file — no rebuild, no developer, no waiting.
The rate workbook is fingerprinted and recorded against every run, so any figure can be traced to the rates that produced it — and two bills priced under different rates are flagged as not comparable.
Nineteen reconciliation tests re-derive the totals independently. Anything that fails is shown on the bill's own banner. A parameter the survey did not supply is reported, never silently defaulted.
Change the road and culvert inputs. Two independent engines price the same CESMM4 bill and all 19 reconciliation checks must pass.
Indicative sample — a simplified calculator, not the module. The module runs on your own data, and the figures and standards it applies are the ones you enter.
BESPA Expert Systems is suitable for the preliminary design and feasibility study phase of civil infrastructure projects. Outputs are engineering aids, not certified designs: a qualified professional engineer must check and sign off any output before it is issued for construction. Bespa produces a priced bill for review. Rates are those in the master workbook supplied by the user; the estimator checks its own arithmetic, not the market. A bill must be reviewed by a qualified quantity surveyor or engineer before it is issued for tender.

Design-speed-driven horizontal and vertical alignment for low volume roads — superelevation, transitions, sight distance and earthworks.

Design, check and draw reinforced concrete box culverts of one to four cells to AASHTO LRFD — every face reinforced, the outlet protected against scour, and the quantities written as per the Road BOQ Estimator's (a separate module) bill items.
Write to Dr. Kwasi Osafo Ampadu, or use the feedback form on the home page.
Emailinfo@bespa.online