RC Frame Design — Eurocode concrete frames
Structural Design / Module 01 — Eurocode concrete frames

RC Frame Design

Give it the column coordinates and the site data. In under 15 minutes the pipeline returns a fully checked, code-compliant Eurocode scheme — 3D frame analysis, EC2/EC8 member design, EC7 foundations, 18 A3 drawing sheets and quantities — with every check, clause and utilisation shown. Built for preliminary design and feasibility studies, where the answer you need is “will this scheme work, and what will it take?” — not weeks of manual iteration. Independent audit gates re-verify the analysis and every member, returning PASS or FAIL before any drawing or foundation is produced: an audit is a gate, not a comment. Preliminary design only — a professional engineer must independently check and sign off the output before it is issued for construction.

/ What it does

A preliminary Eurocode structural scheme, drawings and quantity take-off in under 15 minutes.

A preliminary Eurocode structural scheme, drawings and quantity take-off in under 15 minutes.

/ Subscription

All applicationsfrom $25/month

One subscription, monthly or annual, unlocks every BESPA application. 7 days free, cancel any time. The demo on this page is free to try.

Checking access…
<15 min
Coordinates to drawings and quantities
8
Pipeline stages, two of them independent audits
1,758
Code checks on the 4-storey demo building
18
A3 drawing sheets, frame and foundation
Designed toEN 1990EN 1991-1-1EN 1991-1-4 WindEN 1992-1-1 ConcreteEN 1997-1 GeotechnicalEN 1998-1 SeismicBS 8666 Bar shapes
/ Capabilities

Built for the real job.

01

3D frame analysis

Stiffness model from your coordinates: gravity, wind to EN 1991-1-4 and modal response-spectrum seismic to EN 1998-1, with cracked stiffness and a rigid diaphragm.

02

EC2 / EC8 member design

Beams, columns, two-way slabs, ductile core walls with boundary elements, coupling beams and balconies — failing members are resized and the frame re-analysed until it converges.

03

Independent audit gates

Separate auditors re-check the analysis and every member against EC2, EC8 and EC7 and return PASS or FAIL. They perform no design, so they have nothing to defend.

04

EC7 foundations

Pads, rafts or bored piles chosen from your borehole data — a shallow solution is overruled when consolidation settlement demands piles.

05

No black box

Every check states demand, capacity, units, utilisation and the Eurocode clause. Governing load case shown, and gaps in the data are reported rather than silently defaulted.

06

Quantity take-off

Concrete volume, reinforcement tonnage and kg/m³ per element and in total — derived from the design, not measured off a drawing.

/ Try it now

Analyse a building frame.

A real stiffness-matrix (FE) solution to a single/multiple-bay building frame — sway, joint and base moments, then member design. The full module runs a whole 3D building frame of up to 12 storeys (or 55 m maximum height). The preview below solves one bay of one storey of that same model.

/ Inputs
/ Results
Design load
37.8 kN/m
1.35 Gk + 1.5 Qk, wind × 1.5
Hogging at joint
191.9 kNm
Beam–column connection
Sagging at midspan
228.2 kNm
Column base moment
124 kNm
Axial 178 kN
Lateral sway
3.6 mm
Within h/300 = 15 mm
Beam tension steel
1,165 mm²
≈ 4 × T20 bottom, 300 × 550 mm section
/ Preview
3D frame≤ 12 storeys≤ 55 mWind EN 1991-1-4Seismic EN 1998-1
full 3D
One bay of one storey — deflected shape (× exaggerated)
38 kN
Bending moment diagram
192 kNm+228 kNm
FE model inputs
Frame span
9 m
Storey height
4.5 m
Dead load Gk
18 kN/m
Live load Qk
9 kN/m
Design UDL
37.8 kN/m
Lateral wind
25 kN
Concrete
C30/35
Column
400 × 300 mm
Beam
550 × 300 mm
Base fixity
Fixed
Wind code
EN 1991-1-4
Seismic code
EN 1998-1
Wind and gravity loads are factored to the design combination shown above. The full 3D module adds torsional eccentricity, modal seismic response, P-Δ second-order effects and cracked-member stiffness.
This preview solves 3 elements / 12 DOF. The full module assembles the same stiffness formulation over the entire 3D frame — every bay, every storey, with rigid diaphragms, cracked stiffness, modal seismic and P-Δ.

Indicative sample — a simplified calculator, not the module. The module runs on your own data, and the figures and standards it applies are the ones you enter.

/ Workflow

Four steps, start to drawing.

  1. 01Fill in two guided Excel forms — building geometry and column coordinates, then the ground investigation.
  2. 02The pipeline analyses, verifies, designs and audits the superstructure.
  3. 03Passing the audit gate releases the drawings, EC7 foundation design and its audit.
  4. 04Download the pack — report, schedules, 18 A3 sheets, take-off and JSON exports.
/ Outputs

What you take away.

  • →Design report with full working (Word / PDF)
  • →Schedules & BS 8666 bar bending (Excel)
  • →18 A3 drawing sheets S00–S12 and F00–F04 (PDF + SVG)
  • →Quantity take-off — concrete m³, steel tonnage, kg/m³
  • →Machine-readable JSON exports
/ The pipeline

Eight stages. Two of them exist only to disagree with the others.

Each stage is a separate engine. Every stage writes a machine-readable export the next one reads — and that you can read too.

P1 · Analysis

3D frame analysis

Gravity, wind and modal response-spectrum seismic with cracked stiffness.

P1V · Verify

Independent re-check

Equilibrium, modal mass, drift and P-Δ reported against code limits, not assumed.

P2 · Design

EC2 / EC8 members

Beams, columns, slabs, core walls, coupling beams and balconies, iterated to convergence.

P3 · Gate

Compliance audit

PASS or FAIL. No drawings or foundations are produced for a non-compliant frame.

P2-D

13 superstructure sheets

Framing plans, beam, column and joint details, core, stairs, balconies, BS 8666 schedule.

P4 · Foundation

EC7 design

Pads, rafts or bored piles from borehole and consolidation data.

P5 · Gate

Foundation audit

Bearing, settlement, pile capacity and spacing, cap geometry, sliding and uplift.

F-D

5 foundation sheets

Foundation GA and setting-out, pile-cap details, typical pile with strata, bar schedule.

The audit is a gate, not a comment. If the superstructure does not comply, drawings and foundation design are not produced. Every failing check is listed with its clause, its utilisation and the specific remedy.

/ Scope

What it does, and what it does not.

In scope

  • ✓Reinforced concrete frames, with or without a core
  • ✓Up to 12 storeys plus basements, within 55 m height and 4:1 slenderness
  • ✓Any orthogonal plan with non-uniform spacing
  • ✓Coupled core walls with real door openings
  • ✓Wind to EN 1991-1-4, modal response-spectrum seismic to EN 1998-1
  • ✓Pad, raft and bored-pile foundations to EN 1997-1 with consolidation settlement
  • ✓Balconies, water tanks, plant, equipment and lift loads

Not in scope

  • ✕Construction-issue drawings — output is preliminary
  • ✕Structural steel and composite frames
  • ✕Non-orthogonal, curved or transfer-structure geometry
  • ✕Post-tensioned floors
  • ✕Slope stability, retaining structures and basement earth pressures
  • ✕Seismic liquefaction assessment
  • ✕Lift guide-rail and pit buffer reactions

Professional responsibility. Bespa Expert Systems output is preliminary design intended for feasibility studies and scheme development. It is not a substitute for a chartered or licensed engineer's independent checking, and a professional engineer must verify and sign off all output before it is issued for construction. Eurocode National Annex parameters vary by country — the supported annex is stated on every report.

/ Continue with
/ Feedback

Questions on rc frame design?

Write to Dr. Kwasi Osafo Ampadu, or use the feedback form on the home page.

Emailinfo@bespa.online
Sign inPricing